Branch Library Architect/Engineer Selection Process, 2nd Advertisement

 

Information Conference,  Dec. 21, 1999 (with Questions and Answers)
Information Conference Sign-in Sheet,   Dec. 21, 1999


Branch Library Architect/Engineer Selection Process, 2nd Advertisement
Dec. 15, 1999

The Seattle Public Library seeks four architect and engineer (A/E) teams to provide design services for five branch library projects located in Ballard, Greenwood, Lake City and Greenlake/West Seattle. The Ballard and Greenwood Libraries are each planned to be new buildings at 15,000 SF. The Lake City Library is an expansion of an existing library to 15,000 SF. Greenlake and West Seattle are historic renovations to Carnegie Libraries and will both be awarded to one firm. Full descriptions of these projects can be found on the SPL Web site at the following address:

http://www.spl.org/capplan/libforall/nlb/nlbdir.html

The projects will not require library programming services, but some will require analysis of site alternatives in addition to building and site design work.

Submittal Requirements:

  • A cover letter stating which of the projects the team is interested in. Firms may be considered for any or all of the projects.
  • Letters of interest specific to each project for which the team wants to be considered. Letters should be addressed to the Advisory Panel.
  • Forms 254 and 255 listing recent projects, references for those, and summary resumes of staff who would be assigned to the project. The names and roles of any proposed subconsultant firms should be clearly identified.
  • Any illustrative materials necessary to adequately describe relevant project experience.

The total amount of material submitted should not exceed thirty two-sided 8 ½ x 11" pages, or sixty surfaces including the 254 and 255 forms, illustrative material, letters, resumes, etc. Fifteen copies of this material should be provided for the first project for which the firm would like to be considered and five additional copies for each additional project. Materials may be mailed or hand delivered to:

Alexandra Harris,
Capital Program Director
Seattle Public Library – 5th Floor
1000 Fourth Avenue
Seattle, WA 98104-1193

These materials must be submitted by 2:00 p.m. Thursday, January 13, 2000.

Information Conference:

An information conference will be held at 11:00 a.m. Tuesday, December 21, 1999 at the Central Library, 1000 4th Avenue, Lee Auditorium where interested firms may ask questions about the projects or selection process. Questions and answers from this session will be summarized in writing and distributed to all firms which sign in at the meeting, and any others who request copies.

Selection Process:

Library staff will screen and sort the submittals to evaluate qualifications for performing the projects. Criteria used in evaluation will include:

  • Overall design quality as demonstrated in the material submitted.
  • Experience with projects of a similar scale and scope as the branch libraries.
  • Experience working effectively with staff and client groups on architectural projects.
  • Record of effective schedule and budget management for projects of similar size.
  • Experience with library projects is preferred, but is not a requirement for consideration.
  • Experience working with public sector projects and processes will be valued, but is also not a requirement for consideration.
  • References from clients, contractors, and subconsultants your team has worked with recently.

Additional criteria used in the evaluation of teams interested in the Greenlake/West Seattle project will include:

  • Experience with historic structures and demonstrated sensitivity to the original building.

This initial staff review will create a list of firms qualified to do the projects.

Community Involvement in A/E Selection Recommendation:

The Library Board, Branch Staff, and the City will identify representatives from each neighborhood to join with a Library Board representative and SPL staff in a process to further screen the A/E teams who were shortlisted through the staff review. The list of qualified firms will be provided to these neighborhood advisors, and library staff will support their efforts to evaluate the appropriateness of firms for the specific branch project. The advisory groups and library staff will interview the teams, and recommend a selection to the Library Board. Selection decisions will be made by the Library Board.

Teams who are selected to interview may be asked to participate in a community open house.

Interviews:

A separate interview process will be held for each of the projects. Interviews will likely occur in the first quarter of the year.

Women and Minority Business Enterprise Utilization:

Like its general population, Seattle’s business community is diverse. The City of Seattle encourages contractors to employ a workforce reflective of the region’s diversity. The City encourages the utilization of minority-owned businesses (MBEs) and women-owned businesses (WBEs) (collectively, WMBEs), in all City contracts. Pre-notification, open solicitation, small business-oriented task grouping for subcontracts, and cooperative recruitment are beneficial contract management practices that aid in successful identification and incorporation of WMBEs into this contract.

Contractors, bidders, and proposers shall not create barriers to open and fair opportunities for WMBEs to participate in all City contracts and to obtain or compete for contracts and subcontracts as sources of supplies, equipment, construction and services. In considering offers from and doing business with subcontractors and suppliers, the Contractor shall not discriminate on the basis of race, color, creed, religion, ethnicity, sex, age, nationality, marital status, sexual orientation, or the presence of any mental or physical disability in an otherwise qualified person.

The City has a goal of 27% MWBE utilization on its public works/construction projects. This goal is not a preference, and the City does not grant preferential treatment based on either race or gender in the awarding of its contracts. Thus, whether the Contractor meets the City’s WMBE goal in its bid or proposal will not be a consideration in the awarding of this contract.

 

Dates of Advertisement in the Daily Journal of Commerce:

December 15, 1999
December 20, 1999

 

 

Content modified: 28 December 1999

 

12/30/2005